The last project realized in Lithuania

The last project of KOMFORTS, that was completed in 2016, in Lithuania is launching its operation along with the start of the heating season - 4 MW centralized heat generation system. This is the 8th project in Lithuania carried out with the equipment produced by KOMFORTS and having a capacity of 4MW or above. The total power of equipment installed in the projects in Lithuania up till now is 66.5 MW.